Monday, December 31, 2007
Monday, December 10, 2007
Mission completed
Saturday
Kayuhan maut......Kuala Lumpur to Ipoh
205.56km in total riding time 7hrs 38min
Average speed 26.9km/h
Average cad. 86
(180km in 6hrs 45min)
Started 8.00am from Selayang Pasar Borong....
5 times stop for breakfast....2 times toilet.....lunch n refilled.
Arrived Ipoh at 5.05pm.
PUAS GILER.......
Kayuhan maut......Kuala Lumpur to Ipoh
205.56km in total riding time 7hrs 38min
Average speed 26.9km/h
Average cad. 86
(180km in 6hrs 45min)
Started 8.00am from Selayang Pasar Borong....
5 times stop for breakfast....2 times toilet.....lunch n refilled.
Arrived Ipoh at 5.05pm.
PUAS GILER.......
Thursday, December 6, 2007
Dah lama tak kayuh
Date: 8th December 2007
Day: Saturday
Time: Target start kul 7.30am from Pasar Borong Selayang
Route: Kuala Lumpur-Ipoh (Jalan Lama)
Distance: 180km ++
Participant list:
AbuPower
SaifulKodi
Day: Saturday
Time: Target start kul 7.30am from Pasar Borong Selayang
Route: Kuala Lumpur-Ipoh (Jalan Lama)
Distance: 180km ++
Participant list:
AbuPower
SaifulKodi
Subscribe to:
Posts (Atom)